Leezy Posted May 29, 2020 Share Posted May 29, 2020 what is the recommended Disk Reclamation schedule? how frequent do we run? i have near 1TB space to reclaim at offsite and we found out that each time we do space reclaim, the process will takes about 2-3 days. it is quite painful when we dealing with large data size. are there any specific recommendation to deal with this ? 1 Quote Link to comment Share on other sites More sharing options...
Official Moderator Posted May 29, 2020 Share Posted May 29, 2020 Hello! Please note that space reclaim maintenance is accumulative. It means you can stop it at any time and then continue from where you stopped it. Moreover, if the space reclaim is running but you need to run the job already, then space reclaim maintenance will be stopped automatically. These are the default settings. We start working with bigger data blocks and end with the smallest ones. That's why Space Reclaim maintenance is the most effective during the first 30-40% of the whole run. It's done in order to avoid the disk storage bottleneck. Quote Link to comment Share on other sites More sharing options...
vger74656 Posted June 16, 2020 Share Posted June 16, 2020 Would it be possible to schedule the stop of space reclaim? That way it does the bigger blocks which accounts for the majority of the space. Reason I ask is that we will have around 350 separate repositories and if the power goes out at any one of them, it corrupts the backups, and when this is multiplied by the amount of repositories, it makes it a nightmare to manage. 1 Quote Link to comment Share on other sites More sharing options...
Official Moderator Posted June 17, 2020 Share Posted June 17, 2020 It is possible to schedule only start of space reclaim. In case Space reclaim maintenance would be run on weekly or two-weekly basis (depending on the used time, to minimize influence on production), most likely it will take much less time that running once per month, or once per two months. Quote Link to comment Share on other sites More sharing options...
Greg Posted October 3, 2022 Share Posted October 3, 2022 I would like to be able to schedule the stop of the space reclaim as well. The stop process of the space reclaim, if I check the box to automatically stop the process if a job is starting, takes so long to properly cancel that all the jobs that are queued fail, then the reclaim finally stops, but the jobs have already failed after multiple retries and simply do not back up. 1 Quote Link to comment Share on other sites More sharing options...
Official Moderator Posted October 3, 2022 Share Posted October 3, 2022 2 hours ago, Greg said: I would like to be able to schedule the stop of the space reclaim as well. The stop process of the space reclaim, if I check the box to automatically stop the process if a job is starting, takes so long to properly cancel that all the jobs that are queued fail, then the reclaim finally stops, but the jobs have already failed after multiple retries and simply do not back up. @Greg The best way would be to generate and send a support bundle ( https://helpcenter.nakivo.com/display/NH/Support+Bundles ) to support@nakivo.com so our Technical Support team can investigate it and forward your feature request to our Product Development team for possible future implementation. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.