pfs Posted December 21, 2022 Share Posted December 21, 2022 We have been using a Backup Copy job for a while to copy our primary backup repository to a secondary storage server with more space. We would now like to switch the current VMWare backup job to use the copy target instead. Currently we run our backup jobs in sequence, starting each job as a follow on from the previous. So this should mean that the Repository Copy is current each day after the jobs have all completed. What is the best way to change the target repository for our backup jobs? I cannot find anything in the doco or forum which suggests a method to do this. Thanks in advance 1 Link to comment Share on other sites More sharing options...
Official Moderator Posted December 21, 2022 Share Posted December 21, 2022 3 hours ago, pfs said: We have been using a Backup Copy job for a while to copy our primary backup repository to a secondary storage server with more space. We would now like to switch the current VMWare backup job to use the copy target instead. Currently we run our backup jobs in sequence, starting each job as a follow on from the previous. So this should mean that the Repository Copy is current each day after the jobs have all completed. What is the best way to change the target repository for our backup jobs? I cannot find anything in the doco or forum which suggests a method to do this. Thanks in advance @pfs, your request was received and forwarded to our Level 2 Support Team. We will follow up with you shortly. Thank you for choosing NAKIVO Backup & Replication as your data protection solution. Link to comment Share on other sites More sharing options...
Official Moderator Posted December 21, 2022 Share Posted December 21, 2022 10 hours ago, pfs said: We have been using a Backup Copy job for a while to copy our primary backup repository to a secondary storage server with more space. We would now like to switch the current VMWare backup job to use the copy target instead. Currently we run our backup jobs in sequence, starting each job as a follow on from the previous. So this should mean that the Repository Copy is current each day after the jobs have all completed. What is the best way to change the target repository for our backup jobs? I cannot find anything in the doco or forum which suggests a method to do this. Thanks in advance Hello, @pfs, thank you for your interest in NAKIVO! You can change the target repository on the destination step by keeping/deleting old backups (see the attached screenshot for more details). Feel free to let us know if there is anything else we can assist you with, and we will get back to you. We are looking forward to hearing from you. Best regards. Link to comment Share on other sites More sharing options...
pfs Posted December 22, 2022 Author Share Posted December 22, 2022 Thank you for your reply. This has worked well for us. Appreciated 1 Link to comment Share on other sites More sharing options...
Official Moderator Posted December 23, 2022 Share Posted December 23, 2022 6 hours ago, pfs said: Thank you for your reply. This has worked well for us. Appreciated @pfs Feel free to let us know if there is anything else we can assist you with Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now